Subansiri Lower Hydroelectric Project is which type of hydropower scheme?
Correct Answerसही उत्तर
A. Run-of-the-River with small pondageA. Small pondage वाली Run-of-the-River scheme
Explanationव्याख्या
The Subansiri Lower project is described as a Run-of-the-River hydroelectric scheme with small pondage.
It is expected to generate around 7,422 million units of renewable electricity annually.
The project uses eight Head Race Tunnels.
For exam preparation, students should connect Subansiri Lower with run-of-the-river hydropower, 2,000 MW capacity and NHPC Limited.
Subansiri Lower को small pondage वाली Run-of-the-River hydroelectric scheme बताया गया है। इससे लगभग 7,422 million units renewable electricity annually generate होने की जानकारी दी गई है। Project में आठ Head Race Tunnels हैं। परीक्षा के लिए Subansiri Lower को Run-of-the-River, 2,000 MW और NHPC Limited के साथ याद रखें।
Practice More Like This
Vitorr selects questions using the same topic, subject, exam and overlapping concepts—not just database order.
Related Quizzes
Continue with quizzes connected to 2026 Current Affairs and Current Affairs. Sign up is required only when you start a quiz.