Para Jumble practice question for SSC. Review the correct answer and explanation, then continue with related practice below.
Arrange the following sentences in the correct order. A. The expansion creates demand for additional supporting infrastructure that was not included in the original project estimate. B. A city builds a new residential area on previously undeveloped land. C. Residents require roads, drainage, schools and reliable transport connections. D. The full cost of the development may therefore be substantially higher than the construction cost of the houses alone. Options:
Correct Answerसही उत्तर
A. BCAD
Explanationव्याख्या
(English): B introduces the residential development.
C identifies the facilities residents need.
A explains the additional infrastructure demand.
D gives the broader cost implication.
Overall Meaning: The cost of residential expansion includes supporting infrastructure, not merely the houses.
व्याख्या (Hindi): B में नए आवासीय क्षेत्र का निर्माण होता है।
C में सड़क, जलनिकासी, विद्यालय और परिवहन जैसी आवश्यकताएँ सामने आती हैं।
A में अतिरिक्त आधारभूत संरचना की माँग स्पष्ट होती है और D में कुल परियोजना लागत घरों के निर्माण खर्च से अधिक होने का निष्कर्ष दिया गया है।
समग्र अर्थ:
नए आवासीय क्षेत्र की लागत में मकानों के साथ आवश्यक आधारभूत सुविधाओं का खर्च भी शामिल होता है।
Practice More Like This
Vitorr selects questions using the same topic, subject, exam and overlapping concepts—not just database order.
Related Quizzes
Continue with quizzes connected to Para Jumble and English. Sign up is required only when you start a quiz.