What is the planned total installed capacity of the Subansiri Lower Hydroelectric Project?
Subansiri Lower Hydroelectric Project की planned total installed capacity कितनी है?
Answer and explanation are free to read — no sign-in required.उत्तर और व्याख्या पढ़ने के लिए साइन-इन आवश्यक नहीं है।
Correct Answerसही उत्तर
C. 2,000 MWC. 2,000 MW
Explanationव्याख्या
The Subansiri Lower Hydroelectric Project has a planned capacity of 2,000 MW. It consists of eight generating units, each rated at 250 MW. Therefore, 8 × 250 MW gives a total of 2,000 MW. The numerical combination is important for examinations because questions can separately ask the number of units, capacity per unit or total project capacity.
Subansiri Lower Hydroelectric Project की planned total capacity 2,000 MW है। इसमें 250 MW क्षमता वाली 8 generating units हैं। इसलिए 8 × 250 MW = 2,000 MW होता है। परीक्षा में number of units, capacity per unit और total capacity तीनों को अलग-अलग पूछा जा सकता है।
Practice More Like This
Vitorr selects questions using the same topic, subject, exam and overlapping concepts—not just database order.
Related Quizzes
Continue with quizzes connected to 2026 Current Affairs and Current Affairs. Sign up is required only when you start a quiz.