2026 Current Affairs practice question for Railways, SSC, UPSC. Review the correct answer and explanation, then continue with related practice below.
What is the proposed capacity of the Dulhasti Stage-II hydropower project?
Correct Answerसही उत्तर
B. 260 MWB. 260 MW
Explanationव्याख्या
Dulhasti Stage-II has a proposed capacity of 260 MW.
Students should not confuse this with Dulhasti Stage-I, which has a capacity of 390 MW and has been operational since 2007 under NHPC Limited.
Stage-II is estimated to cost more than ₹3,200 crore.
Dulhasti Stage-II की proposed capacity 260 MW है। इसे Dulhasti Stage-I की 390 MW capacity से confuse नहीं करना चाहिए। Stage-I 2007 से NHPC Limited के अंतर्गत operational है। Stage-II की estimated cost ₹3,200 crore से अधिक है।
Practice More Like This
Vitorr selects questions using the same topic, subject, exam and overlapping concepts—not just database order.
Related Quizzes
Continue with quizzes connected to 2026 Current Affairs and Current Affairs. Sign up is required only when you start a quiz.