Consider the following statements about the Subansiri Lower Hydroelectric Project: 1. It has a planned capacity of 2,000 MW. 2. It consists of eight units of 250 MW each. 3. It is a Run-of-the-River project with small pondage. Which of the statements given above are correct?
Subansiri Lower Hydroelectric Project के बारे में निम्न कथनों पर विचार कीजिए: 1. इसकी planned capacity 2,000 MW है। 2. इसमें 250 MW की आठ units हैं। 3. यह small pondage वाली Run-of-the-River project है। उपरोक्त में से कौन-से कथन सही हैं?
Answer and explanation are free to read — no sign-in required.उत्तर और व्याख्या पढ़ने के लिए साइन-इन आवश्यक नहीं है।
Correct Answerसही उत्तर
D. 1, 2 and 3D. 1, 2 और 3
Explanationव्याख्या
All three statements are correct according to the February 2026 material. The Subansiri Lower Hydroelectric Project is planned for 2,000 MW through eight units of 250 MW each. It is a Run-of-the-River scheme with small pondage. The project is also expected to generate about 7,422 million units annually and includes a 116-metre-high concrete gravity dam. These interconnected facts make the project suitable for multi-statement questions.
फरवरी 2026 सामग्री के अनुसार तीनों statements सही हैं। Subansiri Lower Hydroelectric Project की planned capacity 2,000 MW है, जो 250 MW की आठ units से प्राप्त होती है। यह small pondage वाली Run-of-the-River scheme है। इससे लगभग 7,422 million units annual electricity generation की अपेक्षा है और इसमें 116 metre ऊंचा concrete gravity dam भी शामिल है।
Practice More Like This
Vitorr selects questions using the same topic, subject, exam and overlapping concepts—not just database order.
Related Quizzes
Continue with quizzes connected to 2026 Current Affairs and Current Affairs. Sign up is required only when you start a quiz.