QUESTION 401Good Governance Week 2025 was organised during which period?
Good Governance Week 2025 किस अवधि के दौरान आयोजित किया गया?A. 1-7 December 2025B. 10-16 December 2025C. 19-25 December 2025D. 25-31 December 2025
Show answer & explanation
Answer: C
DARPG organised Good Governance Week 2025 from 19 December to 25 December 2025. The campaign emphasised people-centric governance and grievance redressal. It was implemented across 36 States and Union Territories. A National Workshop was held in New Delhi on the concluding day, 25 December 2025.
QUESTION 402Which department organised Good Governance Week 2025 and the Prashashan Gaon Ki Ore campaign?
Good Governance Week 2025 और Prashashan Gaon Ki Ore campaign का आयोजन किस विभाग ने किया?A. DARPGB. NITI AayogC. Department of Rural DevelopmentD. Election Commission of India
Show answer & explanation
Answer: A
The Department of Administrative Reforms and Public Grievances, abbreviated as DARPG, organised Good Governance Week 2025 from 19 to 25 December 2025. Prashashan Gaon Ki Ore was conducted across 36 States and Union Territories at district and tehsil levels, with activities including grievance disposal, CPGRAMS redressal, special camps and dissemination of governance best practices.
QUESTION 403How much was released to Jharkhand as the first instalment under the XV Finance Commission grants mentioned in the PDF?
PDF में उल्लिखित XV Finance Commission grants के अंतर्गत Jharkhand को first instalment के रूप में कितनी राशि जारी की गई?A. ₹145.24 croreB. ₹275.13 croreC. ₹303.04 croreD. ₹448.28 crore
Show answer & explanation
Answer: B
Jharkhand received ₹275.13 crore as the first instalment. The grant covered 24 District Panchayats, 253 Block Panchayats and 4,342 Gram Panchayats. These Finance Commission grants are intended to strengthen Panchayati Raj Institutions and Rural Local Bodies and therefore relate directly to fiscal decentralisation and grassroots governance.
QUESTION 404How much was released to Rajasthan as the first instalment of Untied Grants under the Fifteenth Finance Commission for FY 2025-26?
FY 2025-26 के लिए Fifteenth Finance Commission के अंतर्गत Rajasthan को Untied Grants की first instalment के रूप में कितनी राशि जारी की गई?A. ₹145.24 croreB. ₹275.13 croreC. ₹303.04 croreD. ₹723 crore
Show answer & explanation
Answer: C
Rajasthan received ₹303.04 crore as the first instalment of Untied Grants for FY 2025-26. The amount covered 24 District Panchayats, 339 Block Panchayats and 3,857 Gram Panchayats. Separately, ₹145.24 crore of withheld Untied Grants from FY 2024-25 was also released. Students should distinguish the current first-instalment amount from the previously withheld amount.
QUESTION 405Atal Run-2025 was organised on which birth anniversary of Atal Bihari Vajpayee?
Atal Run-2025, Atal Bihari Vajpayee की कौन-सी जयंती पर आयोजित किया गया?A. 99thB. 100thC. 101stD. 102nd
Show answer & explanation
Answer: C
Atal Run-2025 was flagged off on Atal Bihari Vajpayee's 101st birth anniversary. Vajpayee was born on 25 December 1924. The source also identifies his period as former Prime Minister of India as 1998-2004. Remembering the date of birth helps students understand why the 2025 observance represented the 101st birth anniversary.
QUESTION 406Who flagged off Atal Run-2025?
Atal Run-2025 को किसने flag off किया?A. Nitin GadkariB. Manohar LalC. Jitendra SinghD. G. Kishan Reddy
Show answer & explanation
Answer: A
Union Minister Nitin Gadkari flagged off Atal Run-2025 on the 101st birth anniversary of former Prime Minister Atal Bihari Vajpayee. The event included categories for men, women and under-16 participants in addition to the main Atal Run. Gadkari described Vajpayee as an inspiration and the run as a tribute connected with his vision for India.
QUESTION 407Where is the headquarters of NHPC Limited, according to the static points associated with the Subansiri Lower project?
Subansiri Lower project से जुड़े static points के अनुसार NHPC Limited का headquarters कहां है?A. New DelhiB. Faridabad, HaryanaC. Gurugram, HaryanaD. Shimla, Himachal Pradesh
Show answer & explanation
Answer: B
The PDF lists the headquarters of NHPC Limited as Faridabad, Haryana. It also names Bhupender Gupta as Chairman and CMD in the static points accompanying the project. Combining current affairs with such organisational static facts is useful because competitive examinations frequently ask headquarters, leadership and project-organisation matching questions.
QUESTION 408What is the height of the concrete gravity dam associated with the Subansiri Lower Hydroelectric Project?
Subansiri Lower Hydroelectric Project से जुड़े concrete gravity dam की ऊंचाई कितनी है?A. 86 metresB. 100 metresC. 116 metresD. 150 metres
Show answer & explanation
Answer: C
The project includes a 116-metre-high concrete gravity dam, described in the February 2026 material as the largest dam in North-East India. The dam supports not only electricity generation but also flood moderation and water management. This makes 116 metres an important factual figure for objective examinations.
QUESTION 409Approximately how much renewable electricity is the Subansiri Lower project expected to generate annually?
Subansiri Lower project से प्रति वर्ष लगभग कितनी renewable electricity उत्पन्न होने की अपेक्षा है?A. 3,422 million unitsB. 5,500 million unitsC. 7,422 million unitsD. 10,000 million units
Show answer & explanation
Answer: C
The project is expected to generate approximately 7,422 million units of renewable electricity annually. This output is associated with a total planned installed capacity of 2,000 MW. The project uses eight Head Race Tunnels and is intended to contribute to renewable-energy expansion and strengthening of the national electricity grid.
QUESTION 410Subansiri Lower Hydroelectric Project is which type of hydropower scheme?
Subansiri Lower Hydroelectric Project किस प्रकार की hydropower scheme है?A. Run-of-the-River with small pondageB. Tidal power projectC. Pumped-storage project onlyD. Offshore hydro project
Show answer & explanation
Answer: A
The Subansiri Lower project is described as a Run-of-the-River hydroelectric scheme with small pondage. It is expected to generate around 7,422 million units of renewable electricity annually. The project uses eight Head Race Tunnels. For exam preparation, students should connect Subansiri Lower with run-of-the-river hydropower, 2,000 MW capacity and NHPC Limited.
QUESTION 411What is the planned total installed capacity of the Subansiri Lower Hydroelectric Project?
Subansiri Lower Hydroelectric Project की planned total installed capacity कितनी है?A. 1,000 MWB. 1,500 MWC. 2,000 MWD. 2,500 MW
Show answer & explanation
Answer: C
The Subansiri Lower Hydroelectric Project has a planned capacity of 2,000 MW. It consists of eight generating units, each rated at 250 MW. Therefore, 8 × 250 MW gives a total of 2,000 MW. The numerical combination is important for examinations because questions can separately ask the number of units, capacity per unit or total project capacity.
QUESTION 412Which unit of the Subansiri Lower Hydroelectric Project was inaugurated for commercial operation by Union Minister Manohar Lal?
केंद्रीय मंत्री मनोहर लाल ने Subansiri Lower Hydroelectric Project की किस unit के commercial operation का उद्घाटन किया?A. Unit-1B. Unit-2C. Unit-5D. Unit-8
Show answer & explanation
Answer: B
Union Minister Manohar Lal inaugurated the commercial operation of Unit-2 of the Subansiri Lower Hydroelectric Project through virtual mode. Unit-2 has a capacity of 250 MW. The complete project is designed to have eight units of 250 MW each, giving a planned total capacity of 2,000 MW. This is an important hydropower development because the project supports renewable electricity generation, the national power grid and socio-economic development of North-East India.
QUESTION 413According to the February 2026 current-affairs material, Har Ghar Jal Gram Panchayats were expected to complete Jal Seva Aankalan by which date?
फरवरी 2026 करेंट अफेयर्स सामग्री के अनुसार Har Ghar Jal Gram Panchayats को Jal Seva Aankalan किस तारीख तक पूरा करना था?A. 26 January 2026B. 15 August 2026C. 2 October 2026D. 31 March 2027
Show answer & explanation
Answer: A
The February 2026 source states that Har Ghar Jal Gram Panchayats were expected to complete the assessment by 26 January 2026. The initiative enables villages to review their own drinking-water delivery systems and identify shortcomings early. The important examination combination is Jal Seva Aankalan – Jal Jeevan Mission – Gram Panchayat-led assessment – 26 January 2026.
QUESTION 414What is one major governance objective of Jal Seva Aankalan?
Jal Seva Aankalan का एक प्रमुख governance objective क्या है?A. Strengthening community ownership and local decision-makingB. Centralising all village decisions in New DelhiC. Replacing all Gram Panchayats with private agenciesD. Ending digital monitoring of water services
Show answer & explanation
Answer: A
A major purpose of Jal Seva Aankalan is to strengthen community ownership and local decision-making in rural drinking-water management. By allowing Gram Panchayats and Gram Sabhas to identify service gaps themselves, the initiative supports decentralised governance, transparency and faster corrective action.
QUESTION 415Jal Seva Aankalan assesses drinking-water service functionality through which portal?
Jal Seva Aankalan पेयजल सेवा की functionality का assessment किस portal के माध्यम से करता है?A. Jal Jeevan Mission portalB. PM GatiShakti portalC. GeM portalD. UDYAM portal
Show answer & explanation
Answer: A
The assessment is carried out through the Jal Jeevan Mission portal. The digital approach allows Gram Panchayats and villages to evaluate water-service functionality themselves. The broader goals include community ownership, local decision-making, transparency, sustainability and early identification of service gaps.
QUESTION 416Jal Seva Aankalan is best described as which of the following?
Jal Seva Aankalan को निम्न में से किस रूप में सबसे सही वर्णित किया जा सकता है?A. A Gram Panchayat-led digital self-assessment tool for drinking-water servicesB. A national irrigation dam construction programmeC. A private bottled-water certification schemeD. An urban sewage tax portal
Show answer & explanation
Answer: A
Jal Seva Aankalan is a Gram Panchayat-led digital self-assessment mechanism for drinking-water service functionality under the Jal Jeevan Mission. Its distinguishing feature is local self-evaluation: villages can examine their own water-delivery systems using the JJM portal instead of depending entirely on costly third-party surveys.
QUESTION 417Who launched Jal Seva Aankalan under the Jal Jeevan Mission?
Jal Jeevan Mission के अंतर्गत Jal Seva Aankalan किसने लॉन्च किया?A. C. R. PatilB. G. Kishan ReddyC. J. P. NaddaD. Sarbananda Sonowal
Show answer & explanation
Answer: A
Union Jal Shakti Minister C. R. Patil virtually launched Jal Seva Aankalan. The initiative operates under the Jal Jeevan Mission and is designed as a Gram Panchayat-led digital self-assessment tool for evaluating the functionality of village drinking-water services.
QUESTION 418The VR Mine Simulator is expected to reduce training time by approximately what percentage?
VR Mine Simulator से training time लगभग कितने प्रतिशत कम होने की उम्मीद है?A. 50%B. 10%C. 25%D. 75%
Show answer & explanation
Answer: A
The source states that the Virtual Reality Mine Simulator is expected to reduce training time by about 50 percent while improving safety preparedness. This figure is highly suitable for direct numerical current-affairs questions. The simulator also supports scenario-based assessment and certification at different employee levels.
QUESTION 419The Virtual Reality Mine Simulator includes more than 20 training modules primarily related to which area?
Virtual Reality Mine Simulator में 20 से अधिक training modules मुख्य रूप से किस क्षेत्र से संबंधित हैं?A. Heavy machinery operations and safety SOPsB. Agricultural crop managementC. Marine navigationD. Civil aviation ticketing
Show answer & explanation
Answer: A
The simulator contains a 360-degree immersive VR theatre with more than 20 modules focusing on heavy machinery operations and safety standard operating procedures. This makes the system a training technology rather than merely a visual demonstration platform. Scenario-based assessment and employee certification are also part of its intended use.
QUESTION 420The Virtual Reality Mine Simulator at IIT (ISM) Dhanbad was developed in collaboration with which organisation?
IIT (ISM) Dhanbad का Virtual Reality Mine Simulator किस संगठन के सहयोग से विकसित किया गया?A. Coal India Limited and its subsidiariesB. ONGC onlyC. SAIL onlyD. NTPC only
Show answer & explanation
Answer: A
The Virtual Reality Mine Simulator was developed by IIT (ISM) Dhanbad in collaboration with Coal India Limited and its subsidiaries. The system is intended for coal-mining safety and productivity training. Its virtual scenarios allow employees to practise responses and operating procedures without initially facing the hazards of a real mine environment.